[ Avaa Bypassed ]




Upload:

Command:

hmhc3928@3.129.71.42: ~ $
/* $selId: gregor.c,v 2.0 1995/10/24 01:13:06 lees Exp $
 * Copyright 1993-1995, Scott E. Lee, all rights reserved.
 * Permission granted to use, copy, modify, distribute and sell so long as
 * the above copyright and this permission statement are retained in all
 * copies.  THERE IS NO WARRANTY - USE AT YOUR OWN RISK.
 */

/**************************************************************************
 *
 * These are the externally visible components of this file:
 *
 *     void
 *     SdnToGregorian(
 *         long int  sdn,
 *         int      *pYear,
 *         int      *pMonth,
 *         int      *pDay);
 *
 * Convert a SDN to a Gregorian calendar date.  If the input SDN is less
 * than 1, the three output values will all be set to zero, otherwise
 * *pYear will be >= -4714 and != 0; *pMonth will be in the range 1 to 12
 * inclusive; *pDay will be in the range 1 to 31 inclusive.
 *
 *     long int
 *     GregorianToSdn(
 *         int inputYear,
 *         int inputMonth,
 *         int inputDay);
 *
 * Convert a Gregorian calendar date to a SDN.  Zero is returned when the
 * input date is detected as invalid or out of the supported range.  The
 * return value will be > 0 for all valid, supported dates, but there are
 * some invalid dates that will return a positive value.  To verify that a
 * date is valid, convert it to SDN and then back and compare with the
 * original.
 *
 *     char *MonthNameShort[13];
 *
 * Convert a Gregorian month number (1 to 12) to the abbreviated (three
 * character) name of the Gregorian month (null terminated).  An index of
 * zero will return a zero length string.
 *
 *     char *MonthNameLong[13];
 *
 * Convert a Gregorian month number (1 to 12) to the name of the Gregorian
 * month (null terminated).  An index of zero will return a zero length
 * string.
 *
 * VALID RANGE
 *
 *     4714 B.C. to at least 10000 A.D.
 *
 *     Although this software can handle dates all the way back to 4714
 *     B.C., such use may not be meaningful.  The Gregorian calendar was
 *     not instituted until October 15, 1582 (or October 5, 1582 in the
 *     Julian calendar).  Some countries did not accept it until much
 *     later.  For example, Britain converted in 1752, The USSR in 1918 and
 *     Greece in 1923.  Most European countries used the Julian calendar
 *     prior to the Gregorian.
 *
 * CALENDAR OVERVIEW
 *
 *     The Gregorian calendar is a modified version of the Julian calendar.
 *     The only difference being the specification of leap years.  The
 *     Julian calendar specifies that every year that is a multiple of 4
 *     will be a leap year.  This leads to a year that is 365.25 days long,
 *     but the current accepted value for the tropical year is 365.242199
 *     days.
 *
 *     To correct this error in the length of the year and to bring the
 *     vernal equinox back to March 21, Pope Gregory XIII issued a papal
 *     bull declaring that Thursday October 4, 1582 would be followed by
 *     Friday October 15, 1582 and that centennial years would only be a
 *     leap year if they were a multiple of 400.  This shortened the year
 *     by 3 days per 400 years, giving a year of 365.2425 days.
 *
 *     Another recently proposed change in the leap year rule is to make
 *     years that are multiples of 4000 not a leap year, but this has never
 *     been officially accepted and this rule is not implemented in these
 *     algorithms.
 *
 * ALGORITHMS
 *
 *     The calculations are based on three different cycles: a 400 year
 *     cycle of leap years, a 4 year cycle of leap years and a 5 month
 *     cycle of month lengths.
 *
 *     The 5 month cycle is used to account for the varying lengths of
 *     months.  You will notice that the lengths alternate between 30
 *     and 31 days, except for three anomalies: both July and August
 *     have 31 days, both December and January have 31, and February
 *     is less than 30.  Starting with March, the lengths are in a
 *     cycle of 5 months (31, 30, 31, 30, 31):
 *
 *         Mar   31 days  \
 *         Apr   30 days   |
 *         May   31 days    > First cycle
 *         Jun   30 days   |
 *         Jul   31 days  /
 *
 *         Aug   31 days  \
 *         Sep   30 days   |
 *         Oct   31 days    > Second cycle
 *         Nov   30 days   |
 *         Dec   31 days  /
 *
 *         Jan   31 days  \
 *         Feb 28/9 days   |
 *                          > Third cycle (incomplete)
 *
 *     For this reason the calculations (internally) assume that the
 *     year starts with March 1.
 *
 * TESTING
 *
 *     This algorithm has been tested from the year 4714 B.C. to 10000
 *     A.D.  The source code of the verification program is included in
 *     this package.
 *
 * REFERENCES
 *
 *     Conversions Between Calendar Date and Julian Day Number by Robert J.
 *     Tantzen, Communications of the Association for Computing Machinery
 *     August 1963.  (Also published in Collected Algorithms from CACM,
 *     algorithm number 199).
 *
 **************************************************************************/

#include "sdncal.h"
#include <limits.h>

#define GREGOR_SDN_OFFSET         32045
#define DAYS_PER_5_MONTHS  153
#define DAYS_PER_4_YEARS   1461
#define DAYS_PER_400_YEARS 146097

void SdnToGregorian(
					   long int sdn,
					   int *pYear,
					   int *pMonth,
					   int *pDay)
{
	int century;
	int year;
	int month;
	int day;
	long int temp;
	int dayOfYear;

	if (sdn <= 0 ||
			sdn > (LONG_MAX - 4 * GREGOR_SDN_OFFSET) / 4) {
		goto fail;
	}
	temp = (sdn + GREGOR_SDN_OFFSET) * 4 - 1;

	/* Calculate the century (year/100). */
	century = temp / DAYS_PER_400_YEARS;

	/* Calculate the year and day of year (1 <= dayOfYear <= 366). */
	temp = ((temp % DAYS_PER_400_YEARS) / 4) * 4 + 3;
	year = (century * 100) + (temp / DAYS_PER_4_YEARS);
	dayOfYear = (temp % DAYS_PER_4_YEARS) / 4 + 1;

	/* Calculate the month and day of month. */
	temp = dayOfYear * 5 - 3;
	month = temp / DAYS_PER_5_MONTHS;
	day = (temp % DAYS_PER_5_MONTHS) / 5 + 1;

	/* Convert to the normal beginning of the year. */
	if (month < 10) {
		month += 3;
	} else {
		year += 1;
		month -= 9;
	}

	/* Adjust to the B.C./A.D. type numbering. */
	year -= 4800;
	if (year <= 0)
		year--;

	*pYear = year;
	*pMonth = month;
	*pDay = day;
	return;

fail:
	*pYear = 0;
	*pMonth = 0;
	*pDay = 0;
}

long int GregorianToSdn(
						   int inputYear,
						   int inputMonth,
						   int inputDay)
{
	int year;
	int month;

	/* check for invalid dates */
	if (inputYear == 0 || inputYear < -4714 ||
		inputMonth <= 0 || inputMonth > 12 ||
		inputDay <= 0 || inputDay > 31) {
		return (0);
	}
	/* check for dates before SDN 1 (Nov 25, 4714 B.C.) */
	if (inputYear == -4714) {
		if (inputMonth < 11) {
			return (0);
		}
		if (inputMonth == 11 && inputDay < 25) {
			return (0);
		}
	}
	/* Make year always a positive number. */
	if (inputYear < 0) {
		year = inputYear + 4801;
	} else {
		year = inputYear + 4800;
	}

	/* Adjust the start of the year. */
	if (inputMonth > 2) {
		month = inputMonth - 3;
	} else {
		month = inputMonth + 9;
		year--;
	}

	return (((year / 100) * DAYS_PER_400_YEARS) / 4
			+ ((year % 100) * DAYS_PER_4_YEARS) / 4
			+ (month * DAYS_PER_5_MONTHS + 2) / 5
			+ inputDay
			- GREGOR_SDN_OFFSET);
}

char *MonthNameShort[13] =
{
	"",
	"Jan",
	"Feb",
	"Mar",
	"Apr",
	"May",
	"Jun",
	"Jul",
	"Aug",
	"Sep",
	"Oct",
	"Nov",
	"Dec"
};

char *MonthNameLong[13] =
{
	"",
	"January",
	"February",
	"March",
	"April",
	"May",
	"June",
	"July",
	"August",
	"September",
	"October",
	"November",
	"December"
};

Filemanager

Name Type Size Permission Actions
cal_unix.c File 2.35 KB 0644
calendar.c File 20.77 KB 0644
dow.c File 1.48 KB 0644
easter.c File 4.4 KB 0644
french.c File 4.7 KB 0644
gregor.c File 7.42 KB 0644
jewish.c File 25.85 KB 0644
julian.c File 7.97 KB 0644
sdncal.h File 3.95 KB 0644